the project was about restructuring and changing the use of a traditional Aosta Valley building dating back to 1930. The project involved the total renovation of the roofs, the consolidation of the perimeter structures and the internal reallocation , in order to realize nine classrooms, a teachers’ room, a headmaster’s room, two laboratories and a library. Thermal, water, electricity plants and toilets were made from scratch in accordance with national regulations. The project design has also affected the outdoor area with a new perimeter fence, new access paving, a playground with play equipment, new planting of high trunk trees and new green grass surface.